Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources A <br /> 1313 Sherman St., Room 215 �2 All <br /> Denver,Denver,Colorado 80203 \� <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> To: John Nelson, Project Manager <br /> RESOURCES <br /> Roy Romer <br /> Governor <br /> From: Bruce Stover <br /> James S.Lochhead <br /> Executive Director <br /> Date: May 30, 1995 Michael B.Long <br /> Division Director <br /> Re: C-81-048 TBM Project Inspection, 5/25/95 <br /> Kessler called for an Inspection of the work they had completed during the week of 5/22/95 <br /> at TBM. I arrived at the site about 12:30 pm on 5/25/95. It was raining and foggy the whole <br /> way down. The job site was wet, muddy and had standing water in places, but it was clearing <br /> from the south somewhat. <br /> Phil Kessler and I inspected pond at task 6. We had difficulty getting up the access road due <br /> to the wet, muddy conditions. The culvert had been installed under the road, and about 2/3rds <br /> of the dike/dam embankment had been completed on the pond itself (photos taken). It was <br /> still too muddy to gain access for installation of the other culvert for the road ditch diversion. <br /> We also inspected the grading and reclamation of pond 15-P10. The embankment had been <br /> removed and feathering of the reclaimed area was being done in preparation for seeding. Phil <br /> indicated that they did encounter some limited areas of coaly materials, which appeared to be <br /> related to two small coal stringers observed in place on the slopes above the pond to the north. <br /> They covered the outcrop areas of these coal beds with topsoil materials during grading. This <br /> area is ready for seeding (photos taken). <br /> A synopsis of work this week: <br /> Monday 5/22 worked on pond 15 P10, and installed culvert at task 6 <br /> Tuesday 5/23 rained most of day...no work. <br /> Wednesday 5/24 rain, drizzle all day, very muddy, no work. <br /> Thursday 5/25 working pond 15-P10, ready for grading and culvert inspection. <br /> Plans for Friday 5/26: weather permitting...finish dike at task 6 and install second culvert. <br /> Next week they hope to do the stream realignment if the weather improves, and the site drys <br /> up somewhat. They requested seed be delivered ASAP so that reveg work on the reclaimed <br /> pond can be concluded. <br /> I left the site at 2:30 PM. <br />