Laserfiche WebLink
Trinidad Basin Mine Project <br /> Bid Schedule <br /> PKA-9-440 <br /> Item 2 — Reclamation Tasks: <br /> Task Description Bid Amount <br /> 2 Remove pond 15-P1 $ — <br /> i <br /> 3 Remove Diversion 15-D1, Realign Diversion 15-D3 $ OO <br /> � b <br /> 4 Realign stream channel in Section 15 $ �— <br /> 5 Restore spillway on Pond 15-P2 $ a do <br /> 6 b' eSS <br /> dian $ <br /> Cu Wert rMcuh'WCk'�ez Cn.6CM --.>les; ' <br /> 7 Install single fence rock check dam on east-west access road $ 4.r206 o 0 g <br /> 8 Install rip-rap in channel south of Pond 15-P2 <br /> 9 Partial removal of diversion ditch 22-D4 $ yc0 <br /> 10 Gully repair on north-south access road $ P f e, <br /> 06 <br /> 11 Install road dips on north-south access road $ &Fe 2 <br /> 12 Remove culverts on north-south access road $ /Ft) e <br /> 13 Reseeding slope in section 22 $ <br /> 14 Reseeding slope and weed spraying in section 15 $ <br /> c+o <br /> 15 Revegetation, per specs $ <br /> Total (Enter here and on Page 1 of Bid Schedule, Item 2) <br /> $ � J <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />