My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7��JJl <br /> APR 13 '95 08:58AM DIV/MINERALS&GEOLOGY P.2i3 <br /> OF Co,o TATE OF COLORADO <br /> yrr Agreement <br /> �r * Project Name: Tri . d Ba in Minin <br /> 1876 Project No.: MVC- INES.3 8 <br /> This Agreement is between the State of Colorado, by and acting and through the Department of Natural <br /> Resources,Division of Minerals and Geology,hereinafter called the PRINCIPAL REPRESENTATIVE,and Kessler <br /> Reclamation, P.O. Box 41, Rockvale, Colorado 81240, hereinafter called the CONTRACTOR. <br /> WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br /> available and a sufficient uncommitted balance thereof remains available for encumbering and'subsequent <br /> payment of this contract, subject to any additions and deductions, as provided for In Article 47 of the <br /> General Conditions of the Contract,the sum of Sixty-Five Thousarld, Eight Hundred and Thirty-Five Dollars <br /> (S 8 0 , (Fund _ Q " gppr 12,Z, GgL , Coact Encumbrance Number <br /> as provided for in Article 38, of the General Conditions of the Contract; and <br /> WHEREAS, the legislature has declared it to be a State policy that reclamation of land affected by mining <br /> is both necessary and proper and to promote .the reclamation of mined areas left without adequate <br /> reclamation which continue in their unredaimed condition to degrade the quality of the environment or to <br /> endanger the health or safety of the public (34-33-102 C.A.S. as amended); and, <br /> WHEREAS, The Governor has designated the Division of Minerals and Geology as the agency responsible <br /> for inactive mine reclamation in Colorado: and <br /> WHEREAS, one of the duties of the Inactive Mine Reclamation Program is to cooperate with other State <br /> agencies and institutions in the implementation of the Colorado Mined land Reclamation Act and the <br /> Colorado Surface Coal Mining Reclamation Act (34-21-101 C.R.S. as amended); <br /> NOW THEREFORE it is hereby agreed that: <br /> 1. The Conaractor agrees to furnish all the work, labor and materials and perform all the work required <br /> for the complete and prompt execution of everything described or shown in, or reasonably implied <br /> from the Contract Documents, including the Drawings and Specification <br /> project, s for the above described <br /> 2. The Contractor agrees to do the work in a first class, substantial and workmanlike manner to the <br /> satisfaction of the State of Colorado and its Project Manager in strict accordance with the provisions <br /> of the Contract Documents, including the Drawings and Specifications, <br /> 3. The Contractor agrees to complete the entire project within 40 calendar days from the date of the <br /> Notice to Proceed, to begin work within ten,(10) days from the Notice to Proceed and to prosecute <br /> the work with due diligence to completion. <br /> 4. The Contractor agrees that the completion of the project within this time limit is an essential feature <br /> necessary arrangements to insure the completion of the work within the prescribed time.of this Agreement and agrees to proceed with due diligence, taking all precautions and making atl <br /> 5. The Contractor agrees that his failure to complete the work within the time allowed shall be <br /> considered as a breach of the Contract and entitle the State of Colorado to Collect Liquidated <br /> Damages for delay in completion, in accordance with Article 40, of The General Conditions and the <br /> Special Conditions of the Contract. <br /> (over) <br />
The URL can be used to link to this page
Your browser does not support the video tag.