My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-03_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1993-09-03_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 12:23:57 PM
Creation date
7/11/2008 2:16:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/3/1993
Doc Name
PKA-9-440
From
Robert Nondorf
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />oF•COto <br />H o <br />* 1876 <br />Roy Romer <br />September 3, 1993 Governor <br />Michael B. Long <br />To: Mr. Robert Nondorf Division Director <br />From: Jim McArdle <br />Subject: Trinidad Basin Coal Mine Sediment Pond Emergency Repair <br />On September 1, 1993, a prebid meeting was held on the site. A <br />total of 4 contractors attended the prebid, please see the attached <br />contractor sign-in sheet. <br />On September 3, 1993, the following contractors phoned in their <br />bid. <br />1. AZCO Construction (Ron Walker-719-372-6872)-$4,385.00 to <br />excavate the embankment failure, install a 12 inch diameter, 16 <br />gauge galvanized corregated steel pipe with an anti seep ring to <br />act as a primary outlet for the pond. The anti seep ring will <br />extend 1 1/2 feet from the outside edge of the CSP ($50.00 extra if <br />a larger anti seep ring is necessary). The embankment must be <br />reconstructed with compaction to be 90 percent. The corregated <br />steel pipe will be paid for separately from above at the rate of <br />$12.00 per lineal foot. This material price includes the anti seep <br />ring. Extra embankment material will be used from on site. <br />2. Febbraro Construction Company (Joe Febbraro-719-846-7789)- <br />$4,900.00 to excavate the embankment failure, backfill, install the <br />CSP outlet pipe and mobilization. The anti seep ring to be <br />supplied will extend 3 1/2 feet from the side of the 12 inch <br />galvanized Corregated Steel Pipe. The cost of the materials <br />(sufficient 12 inch diameter, 16 gauge galvanized CSP with the anti <br />seep ring as described will be an additional $1,600.00. The fill <br />will be compacted to 90 percent. <br />3. Ferrero Dozer Service (Mike Ferrero-719-846-2176)-NO BID <br />4. J.J. Construction (J.J. Corsentino-719-738-2826)-NO BID
The URL can be used to link to this page
Your browser does not support the video tag.