My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-03-17_GENERAL DOCUMENTS - C1981048 (4)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-03-17_GENERAL DOCUMENTS - C1981048 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 4:06:17 PM
Creation date
7/11/2008 2:14:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
3/17/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 1, 1995 <br /> If the Special Conditions, the Project Manager's instructions, laws, ordinances or any public authority <br /> require any work to be specifically tested or approved, the Contractor shall give the Project Manager <br /> timely notice of its readiness for observation by the Project Manager or inspection by another authority. <br /> If the inspection is by another authority, the Contractor shall give the Project Manager timely notice <br /> of the date of inspection and copies of certificates of inspection being secured by the Contractor. <br /> Article 19. PRIME CONTRACTOR <br /> If several Contractors propose to join together to perform the work, the Principle Representative will <br /> recognize only one bonded prime Contractor, who will enter into a contract with the Principle <br /> Representative, and who will subcontract the work to such others as are required to perform the work, <br /> unless a "joint venture" arrangement between Contractors satisfactory to the Principle Representative <br /> has been executed. In this case, the "joint venture" shall be bonded in accordance with these General <br /> Conditions and shall designate a Superintendent with whom the Principle Representative can <br /> communicate and who will supervise the work and be fully responsible for the performance of the <br /> work. <br /> Article 20. SUPERINTENDENCE OF THE WORK <br /> The Contractor shall keep a competent and reliable superintendent on the job at all times that labor is <br /> being performed. The superintendent, in the Contractor's absence from the site, shall stand in the <br /> stead of the Contractor and any authoritative directions given to the superintendent shall be as binding <br /> as if given to the Contractor. <br /> The Contractor shall give efficient supervision to the work, using his best skill and attention. He shall <br /> carefully study and compare all Drawings, Specifications and other instructions and shall at once report <br /> to the Project Manager any error, inconsistency or omission which he may discover, but he shall not <br /> be liable to the Principle Representative for any damage resulting from any errors or deficiencies in the <br /> Contract Documents or other instructions by the Project Manager. <br /> The Contractor shall see that the work is carried out in accordance with the Contract Documents and <br /> in a thorough and first-class manner in every respect. The Contractor shall establish all lines, levels, <br /> grades, and marks necessary to facilitate the operations of all concerned in such Contractor's work. <br /> He shall lay out the work in a manner satisfactory the Project Manager. <br /> Article 21. SUBCONTRACTORS <br /> The Contractor shall within ten (10) days after the date of Notice of Award, submit to the Project <br /> Manager, a complete list of subcontractors for the project, including the name of the proposed <br /> subcontractor and a description of the work to be subcontracted. The Contractor shall not, without <br /> prior written approval of the Principle Representative, enter into any subcontract covering any part of <br /> the work covered by this contract. <br /> If at any time the Principle Representative determines that any subcontractor is incompetent or <br /> undesirable, he shall notify the Contractor accordingly in writing and the Contractor shall take <br /> immediate steps for cancellation of the subcontract. <br /> Article 22. RELATIONS OF CONTRACTOR AND SUBCONTRACTOR <br /> The Contractor agrees to bind each subcontractor to the terms of these General Conditions and to the <br /> requirements of the drawings and specifications, and any amendments or change orders, and also all <br /> the other Contract Documents, so far as applicable to the work of such subcontractor, unless specially <br /> noted to the contrary. <br /> Nothing contained in the contract shall create any contractual relationship between any subcontractor <br /> and the Principle Representative. Approval by the Principle Representative to any subcontract or any <br /> provisions thereof shall not be construed to be a determination of the acceptability of any subcontract <br /> price, or of any amount paid under subcontract or to relieve the Contractor of any responsibility for <br /> performing all work covered by this contract. <br /> DMG-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.