Laserfiche WebLink
Trinidad Basin Mine Project <br /> Bid Schedule <br /> PKA-9-440 <br /> Item 2 — Reclamation Tasks: <br /> J Task Description <br /> Bid Amount <br /> 2 Remove pond 15-P1 <br /> 3 Remove Diversion 15-D1, Realign Diversion 15-D3 / <br /> 4 Realign stream channel in Section 15 l / L <br /> 5 Restore spillway on Pond 15-P2 <br /> $ <br /> s rad��� 3 CU Wt rna�rit�ncw�ez �n,�asf-���est 3�� �;e <br /> 7 Install single fence rock check dam on east-west access road $ (9v ° <br /> L <br /> Install rip-rap in channel south of Pond 15-P2 `o <br /> Partial removal of diversion ditch 22-D4 $ Lj6e) b b <br /> 10 Gully repair on north-south access road <br /> O11 Install road dips on north-south access road <br /> 12 Remove culverts on north-south access road <br /> 13 Reseeding slope in section 22 $ �o <br /> 61 <br /> 14 Reseeding slope and weed spraying in section 15 $ <br /> 15 Revegetation, per specs <br /> Total (Enter here and on Page 1 of Bid Schedule, Item 2) 0— <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages �s <br /> i <br />