Laserfiche WebLink
Trinidad Basin Mine Project <br /> Bid Schedule <br /> PKA-9-440 <br /> Item 2— Reclamation Tasks: <br /> Task Description Bid Amount <br /> I <br /> 2 Remove pond 15-P1 <br /> i <br /> 3 Remove Diversion 15-D1, Realign Diversion 15-D3 $ / 00 00 <br /> 4 Realign stream channel in Section 15 $ 660 <br /> 5 Restore spillway on Pond 15-P2 $ 'W <br /> lrajjf% Cc <br /> s Vert Mwiltemu'lee. ©n,ects+-46;t $ 3 .0 oO <br /> D ee . O�J <br /> 7 Install single fence rock check dam on east-west access road $ IeO6 <br /> d� <br /> 8 Install rip-rap in channel south of Pond 15-P2 $ -11 <br /> 9 Partial removal of diversion ditch 22-134 $ yC�U <br /> 10 Gully repair on north-south access road $ <br /> Q c, <br /> 11 Install road dips on north-south access road $ &6� <br /> 12 Remove culverts on north-south access road $ Inn <br /> 13 Reseeding slope in section 22 ° <br /> 14 Reseeding slope and weed spraying in section 15 <br /> 15 Revegetation, per specs �� <br /> Total (Enter here and on Page 1 of Bid Schedule, Item 2) $ 9 a <br /> i <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />