Laserfiche WebLink
• <br />B. Critical construction periods: <br />1. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 1211-CO-09-01370-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-0012- 1370-J0?2((OLD NO. 9 EXCAVATION) <br />rrnTU. ZS 16- <br />INSPECTOR SIGNATURE: C. CRL !F?` <br />INSPECTOR TITLE: 't "??'??'' <br />Under the supervision of Michael V. Ludlow, Colorado P.E. #24046 <br />DA <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection as conducted to evaluate: <br />A. Stability of fill (quarterly inspection) <br />NOTES: <br /> <br />file: I:\EN\ENV IRONMENTAL\EMPIRE\INSPREP\WASTEPILEFORM.DOC