My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-07_HYDROLOGY - C1983059
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1983059
>
2008-07-07_HYDROLOGY - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:08 PM
Creation date
7/7/2008 2:31:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
HYDROLOGY
Doc Date
7/7/2008
Doc Name
NPDES (COG-850028)
From
Oxbow Mining, LLC
To
DRMS
Permit Index Doc Type
NPDES
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Permit No. COG-850000 <br />Facility No. COG-850018 <br />Page la <br />Colorado Discharge Permit System Regulations <br />CERTIFICATION <br />under <br />GENERAL PERMIT FOR COAL MINING FACILITIES (SIC NO: 1222) <br />Category 07, Sub-category 5, General Permits, Current fee $7801year (CRS 25-8-502) <br />This certification specifically authorizes Terror Creek Company, to discharge from the Terror Creek Loadout, <br />as described below and in accordance with the General Permit for Coal Mining Facilities (Surface Runoff). <br />All correspondence relative to this facility should reference the specific facility number, COG-850028. <br />Permittee <br />Terror Creek Company <br />43440 Bowie Road <br />Paonia, CO 81428 <br />Facility Contact <br />Kelly Fritzler <br />970-929-5855 <br />Project Name, Activity and Location <br />The Terror Creek Company processes (crushes and screens) and ships coal from nearby mines to speciality markets. Coal is not mined <br />at this facility. Up to 500,000 tons of coal may be processed annually. Discharge is from surface water runoff. The facility is located <br />in NW '/. and SE 'A Section 15, T 13S, R91 W, in Delta County. <br />Outfalls <br />! -Source. Treatmen( Lai/Long 10-Yr, 24-Hr Receiving, Stream <br />Outfalls <br />Capacity J <br />001 Surface Runoff Sedimentation 38° 55.16' / 107° 32.37' 0.29 MG North Fork of the <br />Gunnison River <br />002 Surface Runoff Sedimentation 38° 55.08' / 107° 32.59' 0.12 MG North Fork of the <br />Gunnison River <br />Effluent Parameters <br />The discharge is to the North Fork of the Gunnison River, within Segment 2 of the North Fork of the Gunnison River sub-basin, Gunnison <br />River and Lower Dolores River Basin, found in the Classifications and Numeric Standards for the Gunnison River and Lower Dolores <br />River Basin (Regulation No. 35; last update effective 7/1/07). Segment 2 is Undesignated, and is classified for the following beneficial <br />uses: Aquatic Life, Class 1 Cold; Recreation Class E; Water Supply and Agriculture. <br />Permit Limitations and Monitoring Requirements for Coal Preparation Plants and Associated Areas, Outfalls 001 and 002 <br />Limitatioitc <br />Parameter .30-Day, 7-Dav Dailv Rationale . <br />Alonitoringt Sample <br />Frequency 71Pe <br /> <br />Avg Max:. <br />--- - - <br />- General Permit Requirements <br />Flow, MGD Report NA Report Discharge Evaluation Continuous / Recorder <br />z / <br /> Instantaneous <br />In-situ <br />pH, s. u. N/A NA 65-9.0 Water Quality Standards 2 days /month Grab <br />Oil and Grease, mg/7 N/A NA 10 State Effluent Regulations 2 days /month Visual 3 <br />------------ Federal Effluent Limitation Guidelines <br />Total Suspended Solids, mg/7 * 35 NA 70 Federal ELG 2 days /month Grab <br />Settleable Solids, ml/1 * Report NA 0.5 Federal ELG 2 days /month Grab <br />- --Site Specific Limitations <br />Total Dissolved Solids, mg11 Report NA Report Salinity Regulations Quarterly a Grab <br />Total Recoverable Iron, ug11 *** 1000 NA NA Water Quality Standards 2 days /month Grab <br />1 - For a minor facility, as determined by the EPA NPDES Permit Rating Worksheet, all weekly monitoring requirements shall be changed to 2 days per month. <br />2 - If power is not available, flow may be measured on an instantaneous basis. Major facilities shall monitor flow weekly, minor facilities 2 days / month <br />3 - If a visual sheen is noticed, a grab sample must be taken and analyzed for oil and grease <br />4 - Quarterly monitoring shall be prescribed if the limitation is based upon discharge to the Colorado River Basin. If the limitation is based upon agricultural protection, <br />the monitoring frequency shall be weekly. <br />* Alternate Limitations may also apply. See Below. <br />*** This limitation will apply and will substitute for the 30-day average total iron limit based upon the ELG, when a total recoverable iron standard is applicable to the <br />stream segment. <br />ISSUED: JUNE 24, 2008 EFFECTIVE: JULY 1, 2008 EXPIRES: JUNE 30, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.