Addendum to 2008 Rrll & Gully Survey <br />Page 2 <br />SCC will try to alleviate some of the problem by enlarging YPM-8 and other select channels, e.g. wider shallower <br />side slopes and greater depth. <br />SCC has not found a way to eliminate snow and ice buildup in channels during snowmelt. If the DRMS has a fool- <br />proof method to eliminate channel blockage by ice during snowmelt, we would definitely be interested in reviewing <br />and considering it. <br />3. Nature and extent of erv rion along the Annand Draw tributary downstream of YPM-8, and a plan for rrmediation. <br />Response: SCC personnel physically walked the Annand Draw tributary below YPM-8 and observed various <br />degrees of erosion and down cutting in the channel. In general the channel width is only 1 to 2 feet wide and <br />varying depths up to 8 feet except in one area where the erosion, below a knick point, approaches 25 feet wide by <br />100_feet_long._ - -- -- - - - - -- - - -- - - - - <br />SCC proposes to use varying methods to remediate the channel erosion. The remediation method will be selected <br />as the remediation proceeds along the channel. <br />a) Topsoil will be windrowed away from the channel section to be worked on and re-spread when <br />construction is complete; <br />b) Channel sections will be reconfigured/reshaped as necessary; <br />c) Select portions of the channel could be lined with TRM; <br />d) Select portions of the channel could have check dams installed; or <br />e) Select portions of the channel could be reconfigured/reshaped as a vegetated channel (grade dependent). <br />Sincerely, <br />Roy Karo <br />Reclamation Manager <br />Seneca Coal Company <br />cc: DRMS (Denver Office)