My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-07_HYDROLOGY - C1994082
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1994082
>
2008-07-07_HYDROLOGY - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:08 PM
Creation date
7/7/2008 2:29:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
HYDROLOGY
Doc Date
7/7/2008
Doc Name
Addendum to 2008 Rill & Gully Survey
From
Seneca Coal Company
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum to 2008 Rrll & Gully Survey <br />Page 2 <br />SCC will try to alleviate some of the problem by enlarging YPM-8 and other select channels, e.g. wider shallower <br />side slopes and greater depth. <br />SCC has not found a way to eliminate snow and ice buildup in channels during snowmelt. If the DRMS has a fool- <br />proof method to eliminate channel blockage by ice during snowmelt, we would definitely be interested in reviewing <br />and considering it. <br />3. Nature and extent of erv rion along the Annand Draw tributary downstream of YPM-8, and a plan for rrmediation. <br />Response: SCC personnel physically walked the Annand Draw tributary below YPM-8 and observed various <br />degrees of erosion and down cutting in the channel. In general the channel width is only 1 to 2 feet wide and <br />varying depths up to 8 feet except in one area where the erosion, below a knick point, approaches 25 feet wide by <br />100_feet_long._ - -- -- - - - - -- - - -- - - - - <br />SCC proposes to use varying methods to remediate the channel erosion. The remediation method will be selected <br />as the remediation proceeds along the channel. <br />a) Topsoil will be windrowed away from the channel section to be worked on and re-spread when <br />construction is complete; <br />b) Channel sections will be reconfigured/reshaped as necessary; <br />c) Select portions of the channel could be lined with TRM; <br />d) Select portions of the channel could have check dams installed; or <br />e) Select portions of the channel could be reconfigured/reshaped as a vegetated channel (grade dependent). <br />Sincerely, <br />Roy Karo <br />Reclamation Manager <br />Seneca Coal Company <br />cc: DRMS (Denver Office)
The URL can be used to link to this page
Your browser does not support the video tag.