My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-06_GENERAL DOCUMENTS - C1981042
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981042
>
1996-05-06_GENERAL DOCUMENTS - C1981042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 10:12:14 AM
Creation date
7/3/2008 3:59:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981042
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/6/1996
Doc Name
PKA-7-1016
From
DRMS
To
Interested Contractors
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.3 EXECUTION <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. Operators <br /> shall be qualified to perform all work under this specification in a skillful and professional <br /> manner. The OWNER may, in writing, require the CONTRACTOR to remove from the work <br /> any employee the OWNER deems incompetent or careless. The OWNER will be the sole judge <br /> of the acceptability of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br /> equipment including proper maintenance. <br /> Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and <br /> fuel is minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that particular <br /> area and shall consist of general earthmoving or other finishing work as may be directed by <br /> the PROJECT MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT <br /> MANAGER and work under this section shall be performed only as ordered and directed by <br /> the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be performed <br /> and the order in which it is to be done, and WILL inspect all work. The PROJECT MANAGER <br /> will maintain documentation of the work. <br /> Equipment Rental Documentation <br /> At the close of each day's operations during which equipment rental work has been conducted <br /> under this specification, the PROJECT MANAGER shall prepare a form entitled "Equipment <br /> Rental Record" listing the date,times and total hours (computed to the nearest one-half hour), <br /> each piece of equipment was operated in accordance with this specification. The PROJECT <br /> MANAGER will obtain the signature of the CONTRACTOR on the form. <br /> "Operation" means that time spent in performing work as well as time necessary for moving <br /> equipment around the work site when directed by the PROJECT MANAGER. However, <br /> "operation" does not include that time spent in transporting the equipment to the initial work <br /> site, removing the equipment when all work had been completed, transporting the equipment <br /> away from and returning it to the work site in the event of a temporary or seasonal <br /> suspension of operation, maintenance of the equipment, any time during which the equipment <br /> is "bogged down" or otherwise not working, nor for any periods when operations are <br /> suspended by the PRINCIPLE REPRESENTATIVE. <br /> 4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.