Laserfiche WebLink
CIRCES Cost Estimatina Software <br />sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task #: 005 State : Colorado <br />Date : 07MI2008 County : Pueblo <br />User : AE Site : Tomahawk Mine <br />Permit or other job action : Mobilization Of <br />Task description : SO <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $.117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Costthr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip . <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series /l - 8SU (20 52.55 $50.32 $125.45 2 $351.53 $250.90 $0.00 <br />-Cat 623G 40.92 $75.32 $117.55 2 $385.73 $235.10 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $737.26 $486.00 $0.00 <br />PermiVjob #:M-1991-003 <br />Abbreviation :none <br />Filename :M003-005