Laserfiche WebLink
<br />. <br />.<: <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/houdunit (No. units) Cost/hr/fleet CosVhr/fleet <br />-Water Tanker, 2,500 Gal. $56.94 1 $56.94 $56.94 <br />Subtotals :1 $56.94 1 $58.94 <br />.................... ............. ........... EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Aurora <br />Transportation Cycle Time : Non- Total one-way travel distance : 40.0 <br />Roadable Roadable Average travel speed : 55.0 <br />Equipment Equipment <br />Haul time (hours) = 0.73 0.73 <br />Return time (hours) = 0.73 0.73 <br />Loading time (hours) = 1.00 NA <br />Unloading time (hours) = 1.00 NA <br />Subtotals = 3.45 1.45 <br />JOB TIME AND COST <br />Total non-roadable mob/demob cost • : $3,587.15 <br />two round trips with haul rig <br />Total roadable mob/demob cost'" : $82.82 <br />one round trip, no haul rig <br />Total job time : <br />Total iob cost : <br />miles <br />mph <br />6.91 hours <br />$3,670