Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : SO <br />Task description : Grading highwaii on east side of the affected area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : f per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />volume : 26,736 BCY <br />factor : 1.250 volume : 33,420 LCY <br />Source of estimated volume: Inspection <br />Source of estimated swell factor :Application <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifi/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd--rf) <br /> Push gradient : 1.07 (Cat 118) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HS) <br />Average site altitude : 6,000 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SUAJ) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.50 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Adjusted unit production : 245.51 LCY/hr <br />Adjusted fleet production : 245.51 LCY/hr <br />Total job time : 136.12 Hours <br />Unit cost : $0.605 /LCY Total job cost : $20,204