Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 006 State :Colorado Permit/job# :M-1978-011 <br />Date : <br />User: <br />0612712008 <br />JLE <br />Agency or organization name : DRMS . <br />Permit or other job action : SO <br />Task description :Spreading topsoil at three location, average pile <br />HOURLY EQUIPMENT COST <br />County:Elbert <br />Site : Buffalo <br />Basic machine : Cat D8R Series Il - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br />Operating cost/hour : $57.84 75 <br />Ripper op. cost/hour : $0.67 10 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $148.42 Total fleet cost/hour : $148.42 <br />MATERIAL QUANTITI ..ES.. ...................................................................... ............................ ........................................................................ . <br />.......................... <br />Initial Swell Loose <br />volume : 2,000 BCY factor : 1.429 volume : 2,857 LCY <br />Source of estimated volume: Inspection <br />Source of estimated swell factor :Application <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : <br />Average site altitude : <br />Material weight <br />Weight description <br />Top Soil <br />3.00 % <br />5.900 feet <br />1,600 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Dozer(s) <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.10 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.95 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.75 <br />Adjusted unit production <br />Adjusted fleet production <br />Abbreviation :none <br />Filename :M011-006 <br />Total job time <br />Total job cost <br />(Cat HB) <br />(50 % s/) <br />(avg.) <br />(1 shift/da) <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />367.15 LCY/hr <br />367.15 LCY/hr <br />7.78 <br />11.155 Hours <br />x2?.? ??