Laserfiche WebLink
a x. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $56.94 1 $56.94 $56.94 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $56.94 $56.94 <br />......................... <br />EQUIPMENT: H' ::::::................................................................................................................................................................................... <br />............................................................ <br />AUL DISTANCE and TIME <br />Transportation Cycle Time : <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br /> Nearest major city or town within project area region : Aurora <br />Non- Total one-way travel distance : 40.0 miles <br />Roadable Roadable Average travel speed : 55.0 mph <br />Equipment Equipment <br />0.73 0.73 Total non-roadable mob/demob cost $3,587.15 <br />0.73 0.73 * two round trips with haul rig <br />1.00 NA Total roadable mob/demob cost ** : $82.82 <br />1.00 NA " one round trip, no haul rig <br />3.45 1.45 <br /> :J: M <br /> Total job time : 6.91 hours <br /> Total job cost : $3.670