My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-27_REPORT - C1980007 (4)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2008-06-27_REPORT - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:39 PM
Creation date
6/27/2008 2:12:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REPORT
Doc Date
6/27/2008
Doc Name
2007 Annual Hydrology Report
From
HydroGeo Inc
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine 2007 Annual Hydrology Report 7 <br />• access to most sites at the Project area is impractical, so the baseline monthly monitoring is <br />generally not performed from October through March. A summary of the revised baseline <br />monitoring plan schedule frequencies is presented in Table 1 and the first 5 years of monitoring <br />(including baseline) laboratory parameters are shown on Table 2. <br />Table 1. Monitoring Frequencies <br />• <br />C7 <br />Routine Monitoring Baseline Monitoring <br /> <br />Month Flow / <br />Level Field <br />Parameters Laboratory <br />Analysis <br /> January <br /> February <br /> March <br />Rising Limb - April 3 to May 13 Aril x X X <br />Peak Flow - April 21 to June 26 May x X X <br />Low Flow - July 10 to October 8 June x X X <br /> Jul x X X <br /> August x X X <br /> September x X X <br /> October <br /> November <br /> December <br />In general, baseline monitoring is conducted monthly, usually from April through September in <br />order to provide adequate data to show seasonal variations in water quality and quantity. Winter <br />access to most sites at the Project area is impractical, so the baseline monitoring is generally not <br />performed from October through March. <br />June 2008 HydroGeo, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.