My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-27_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2008-06-27_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:39 PM
Creation date
6/27/2008 2:10:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
6/27/2008
Doc Name
2007 Annual Hydrology Report
From
Peak Project Management, LLC
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring and Remediation Welis <br />As approved by CDPHE, the remediation system and monitoring wells were removed in <br />1999. The NPDES discharge permit for the system has also been terminated. <br />MW 1: MW -1 a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the. Industrial Building at the <br />New Elk Mine. This monitor station was located beyond the anticipated limits of any <br />contamination plume. <br />MW 2: MW-2, a well, was drilled to characterize and monitor rernediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Mine. This monitor station was located beyond the anticipated limits of any <br />contamination plume that might extend in a direction toward the Purgaboire River. <br />MW-3: MW 3, a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Mine. This monitor station was located above the anticipated limits 'of any <br />contamination plume. <br />MW-4: MW-4, a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Mine. This monitor station was located above the anticipated limits of any <br />contamination plume. <br />MW-& MW-b,, a well, was drilled to charac erize and monitor reined"ration work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Marne. This monitor station was located within the area of anticipated highest levels of <br />potential contamination. <br />MW-6: MWA a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Mine. This monitor station was looted within the area of anticipated moderate levels of <br />potential contamination, and to monitor the influence of the groundwater surface to pumping <br />from recovery well R W -1 _ <br />MW 7: MW-7, a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building at the <br />New Elk Mine_ This monitor station was located within the area of anticipated lower levels of <br />potential contamination. <br />UW-8: UW-8, a well, was drilled to characterize and monitor remediation work of apparent <br />leakage from underground storage tanks (removed) located near the Industrial Building <br />11
The URL can be used to link to this page
Your browser does not support the video tag.