Laserfiche WebLink
Marr Mine - 2007 Annual Hydrology Report May 2007 <br />9.0 FUTURE MONITORING <br />During the 2007 water year, monitoring activities were conducted according to methodologies and <br />procedures presented in the approved Kerr Water Monitoring Plan with reductions to the program <br />as approved by the DRMS since issuance of the Monitoring Plan. Monitoring activities in the 2008 <br />water year will continue to be conducted in accordance with approved procedures until final bond <br />release is approved for the mine. Monitoring was restarted in 2005 for the deeper groundwater <br />wells at the mine consistent with monitoring requirements. This monitoring will continue for the <br />Loadout area until that final bond release is submitted and also approved or until authorization is <br />provided by the DRMS. <br />6371/2007/2007 hydrology rpt Page 20 <br />i