My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-25_PERMIT FILE - M2008022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008022
>
2008-06-25_PERMIT FILE - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:33 PM
Creation date
6/26/2008 1:07:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
PERMIT FILE
Doc Date
6/25/2008
Doc Name
Mining setbacks from the Yampa River
From
Allen Sorenson
To
Russ Means
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />L N D O <br />Denver, Colorado 80203 DIO VI A:A <br />D O F <br />Phone: (303) 866-3567 RECLTION <br />FAX: (303) 832-8106 MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />DATE: June 25, 2008 Executive Director <br />Ronald W. Cattany <br />Division Director <br />TO: Russ Means Natural Resource Trustee <br />FROM: Allen Sorenso <br />v <br />RE: Mining Setbacks from the Yampa River, 4B land and Livestock, LLC, <br />Breeze Basin Pit, File No. M-2008-022 <br />Approximately 3.5 acres in the northwest corner of the proposed 19.80 acre pit no. 1 is within zone A of the <br />floodplain (see enclosed flood insurance rate map). If excavation in this portion of the pit were to be <br />approved as proposed in the application, flood flows from the river during a 100-year flood would spill into <br />the pit with the likely result being down cutting and erosion within the mining setbacks and possibly large <br />scale alteration of the river flow paths in the post flood setting. These types of flow path alterations would <br />cause off site damage to river banks both upstream and downstream of the pit and might cause damage to <br />the Deep Cut Ditch. To prevent offsite impacts, the Division requires that these types of pits be excavated <br />in a way that ensures stability through the floodplain. <br />The Division can approve a plan that prohibits mining within the floodplain. To do so, the Applicant must <br />provide maps showing the new extraction limits, and must maintain floodplain boundary markers on the <br />ground throughout the period of operations for this pit. If the Applicant wants to mine within the <br />floodplain, technical analysis and designs must be provided for Division review and approval showing how <br />flood flows could be passed through the pit area without compromising the integrity of the existing <br />floodplain. This is frequently accomplished by the construction of spillways to convey flood flows from the <br />river into the pit, such spillways being designed to be non-erosive during peak flood flows. Diking and <br />levee construction around the north pit perimeter that is with the floodplain would also be effective, but the <br />Applicant would have to demonstrate that diking within the floodplain is acceptable to the local floodplain <br />authority, in this case Moffat county, before the Division would approve such a plan. <br />c:\acs files\My Documents 4-19-06 thru\breeze basin flood review.doc <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.