My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-26_PERMIT FILE - M2008044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008044
>
2008-06-26_PERMIT FILE - M2008044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:35 PM
Creation date
6/26/2008 11:42:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008044
IBM Index Class Name
Permit File
Doc Date
6/26/2008
Doc Name
New 110c Appl
From
Palmer Pipe & Construction, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />Responsibilities as a Permiftee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are a number of <br />important requirements which you, as a permittee, should fully understand. 'T'hese requirements are listed below. Please read and initial <br />each reauiretnent, in the space provided, to acknowledge that you understand your obligations. If you do not understand these <br />obligations then please contact this Office for a full explanation. <br />1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal liability <br />for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands associated with your <br />A mining operation in the event your permit is revoked and financial warranty is forfeited; <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the pernnittee violated the <br />terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the <br />application or your permit misrepresent important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />4. Any modification to the approved mining and reclamation plan from those described in your approved application <br />requires you to submit a permit modification and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />1 6. Upon permit issuance and prior to beginning on-site training activity, you must post a sign at the entrance of the mine <br />site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the permit number. <br />7. The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly visible <br />and adequate to delineate such boundaries prior to site disturbance; <br />8. It is a provision of this permit that the operations will be conducted in accordance with the terns and conditions listed <br />in your application, as well as with the provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />9. Annually, on the anniversary date of permit issuance, you trust submit an annual fee as specified by Statute, and an <br />annual report which includes a trap describing die acreage affected and the acreage reclaimed to date 6f'there are cl>xr es <br />from the prev k year), any nionitering required by the Reclamation Plan to be subirtif ed annually on the anniversary date <br />of the perinit a r aval. Annual fees am for the Previous yes- a peraw. is held. For exan-Vie, a permit. with the annivets-ary <br />date of jury 1, €995, the annual fee is for the period of July 1, 1"44 through ;tune 30, 1995. Failure to submit your annual <br />fee and report by time permit anniversary date may result in a civil penalty, revocation of your permit, and forfeiture of your <br />financial warranty. It is your responsibility, as the permittee, to continue to pay your annual fee to the Office until the Board <br />releases you from your total reclamation responsibility. <br />10. For joint venture.?sarmership pgrnmittee: the signing representative is authorized to sign when document and a power of <br />attorney (provided by the partner(s)) authorizing the signature of the representative is attached to this application.
The URL can be used to link to this page
Your browser does not support the video tag.