My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-26_PERMIT FILE - M2008044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008044
>
2008-06-26_PERMIT FILE - M2008044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:35 PM
Creation date
6/26/2008 11:42:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008044
IBM Index Class Name
Permit File
Doc Date
6/26/2008
Doc Name
New 110c Appl
From
Palmer Pipe & Construction, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riess Research & Planning <br />Naomi Riess <br />1480 E 2"d Ave # 8 <br />Durango, Co 81301 <br />(970) 259-6817 / 946-3561 <br />riessmgt@?frontier.net <br />June 25, 2008 <br />To: La Plata County Commissioners <br />Adjacent Owners <br />Board of Supervisors - Local Conservation Dist. <br />NOTICE <br />Pat Palmer, Owner, Palmer Pipe & Construction [970-946-5920, 381 Ute Junction Circle, <br />Durango, CO 81303], has filed an application for a Construction Materials, Limited Impact <br />(110) Reclamation Permit with the Colorado Mined Land Reclamation Board under provisions <br />of the Colorado Land Reclamation Act for the Extraction of Construction Materials. The <br />proposed mine area is located on his property at 1810 CR 308, Durango, CO, SW 1/4, <br />Section 19, T 34 N, R 8 W, N.M.P.M. The property consists of 85.03 acres and the <br />affected acreage is less than two acre. <br />The purpose of the mining activity and permit application is as a result of the BP gas well <br />expansion on the existing well pad located in the NE corner of the subject property. The <br />expansion created a large amount of material that needed to be utilized elsewhere on the <br />property or removed. This material has already been excavated. Palmer Pipe and <br />Construction used a portion of the material to construct the approved subdivision <br />roadways. The leftover material is to be crushed and removed by being sold to others. <br />The scope of the project is finite. Once the existing pile has been removed there will be <br />no additional activity and the permit will cease. There will be no additional mining or <br />crushing and there will be no large gravel trucks continuing to use the county roads. <br />The proposed date of commencement for removal of material was May 2008 when BP was <br />to begin operations to excavate additional pad area. BP is responsible for all excavation <br />and reclamation of the site. The proposed date of commencement for crushing the gravel
The URL can be used to link to this page
Your browser does not support the video tag.