Laserfiche WebLink
• <br />Worst case reclamation costs for this scenario are shown in Table D-3: <br />Table D-3 Reclamation Task and Cost Estimate <br />Activity Description Time Months Cost $ <br />Bring Topsoil from stockpile, place topsoil on flat areas and sideslopes 7 <br />acres x 12" depth, spread and final grade $0.87 c <br />0.15 <br />$9,825 <br />Disc topsoil areas prior to seeding $200 per acre x 7 acres 0.1 $1,400 <br />Seed,mulch and fertalize all dry land disturbed areas. Drill seeding and <br />crimp mulching will be employed at $850/acre x 7 acres <br />0.1 <br />$5,950 <br />Remove scale house traitor and the truck scales 0.1 $5,000 <br />Totals 0.45 $22,175: <br />DRMS Costs 21% x direct costs $4,657 <br />Total Bond Amount $26,832 <br />• <br /> <br />Pinion Ridge Pit, June 2008 D-6