Laserfiche WebLink
~~ Ur ®"LO,~P DEPARTMENT OF NATURAL RESOURCES <br />~~~ ~~9~ DIVISION OF WATER RESOURCES <br />*~~~* <br />* '~` ,,,n,E wvN"~~ * Bill Ritter, Jr. <br />'~ Ig~6 ~` Response to Reclamation Permit Application Consideration Governor <br />Harris D. Sherman <br />Executive Director <br />Dick Wolfe, P.E. <br />Director <br />DATE: June 23, 2008 <br />TO: G. Russell Means, Environmental Protection Specialist <br />CC: Division 6 Office; District 44 Water Commissioner <br />FROM: Cynthia J. Love, Water Resources Engineer~~~~ <br />RE: Operator: 4B Land & Livestock LLC, Breeze Basin Sand & Gravel Pit <br />File No. M-2008-022 / <br />Section 3, Twp 6 N, Rng 90 W, 6th P.M., Moffat County <br />Landowner- 4B Land & Livestock (Scott and Sheila Brennise) <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />® The proposed operation will consume ground water by ®evaporation, ^dust control, ^reclamation, ®water <br />removed in the mined product, ^processing. Permit No. 67265-F has been issued fora 30.0-acre gravel pit <br />pond for said uses,,with the total appropriation amount limited to 75.7 acre-feet per year. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification hearing process. The only well within 600 feet of the permit area is owned by <br />the applicant. <br />® The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />Any discharges due to dewatering must be returned to the Yampa River such that no material injury will <br />occur to existing water rights. <br />® The applicant has indicated plans to use other, offsite water for uses at the permit site (i.e. dust control, site <br />operations, etc.). The applicant will need to provide evidence to this office that the water is permitted or decreed <br />for such uses. <br />^ Other: _ <br />COMMENTS: As noted in Condition 10 on Permit No. 67265-F, pursuant to Rule 17.1.4 of the Water Well <br />Construction Rules, the owner shall submit, after initiation of construction, site plan and cross section drawings showing <br />the extent of the intended excavation, the maximum depth of the pit, the initial static water level and the initial date of <br />ground water exposure in the pit. <br />RECEIVE <br />JUN 2 4 2008 '~ <br />Office of the State Engineer Division of Reclamation, ~~, <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-8QKA69>iRj and Safety <br />www.water.state. co.us <br />