Laserfiche WebLink
2.03.8 - PERMIT TERM INFORMATION <br />The anticipated start of each phase of mining activities is discussed in <br />Section 2.05.2 and 2.05.3 Operations Plan. <br />The anticipated number of acres of surface lands to be affected (possible <br />subsidence) during the term of this permit: <br />LOCATION EXTENT DURATION <br />Surface Facilities 22.36 Acres Life of Operation <br />Underground Mining 295.5 acres <br />The term of the permit shall be for five (5) years from issuance, renewable <br />under the terms of Rule 2.08.5. <br />GCC Energy, LLC King II Mine <br />Section 2.03.8 <br />Page 1 December, 2007 <br />So--3 <br />hppvveJ q-1-j-1 or