Laserfiche WebLink
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> were inspected at all pond locations. The inlets and embankments were stable and discharge <br /> structures were functioning properly. The ponds are maintained and no problems were noted at <br /> any of the permanent pond locations. <br /> Based on the observations made during this inspection, all sedimentation ponds are currently <br /> compliant with permit conditions. <br /> Reve etg ation <br /> The mine site has received significant snow and rain during the past winter and this spring and as <br /> a result, the vegetation looked very green and generally well established in most areas of the site. <br /> Site grasses came in very well this year. Some troublesome weeds were noted at various <br /> locations. Hounds Tongue in particular was present at the Pond 003 and PECOCO Pond <br /> embankments. Please continue to monitor and control weed species in accordance with the <br /> approved Weed Management Plan. <br />