Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> Road 1 A are variable at present, with the best initial establishment toward the north portion of the road <br /> slopes; patchier establishment in other areas. Small patches of whitetop weed (a noxious perennial <br /> species) were noted in a few locations, and should be sprayed as soon as possible. The small patches <br /> were noted along the lower end of the recently riprapped channel near the old concrete bunker near the <br /> North Portal area, along the outside berm associated with the RSRDA south perimeter ditch (vicinity of the <br /> lower end of the shotcrete ditch lining); and at the south end of the recently seeded fill slope of Access <br /> Road 1 (south of the French Drain cmp outlet). <br /> 4 <br />