approximate original contour. Associated drill roads will be obliterated per USFS <br />direction. <br />ONGOING OPERATING ANTI) MAINTENANCE ACTIVITIES <br />MCC will utilize existing roads to access exhausting blowers for maintenance and <br />service. Each methane fired blower engine will be serviced at 400-hour intervals. All used <br />fluids and trash will be returned to the mine site for proper disposal. Periodically MCC <br />will haul water to the exhausting blowers for cleaning with a portable pressure washer. <br />Water from cleaning will be recovered from the blower containment tanks and <br />transported to the mine site for disposal. <br />From time to time, methane exhausters may have to be moved as part of a <br />planned or an un-planned activity. These moves could occur at any time of the year as <br />inning conditions and needs dictate. MCC will notify the Forest Service within 24 hours <br />of a move that would occur as an unplanned event. Planned moves as part of normal <br />activity would be addressed with the Forest Service in accordance with item 41 of the <br />Conditions of Approval, in the Decision Notice dated May 31, 2002, titled Coal Methane <br />Drainage Project Panels 16-24 VOU771ahl Coal Company ITI'est Elk Mine. To , keep <br />current with improving technnology, MCC requests the ability to change exhauster <br />aligmnents, equipment; and add additional equipment as necessary to meet the needs of <br />the mine as such equipment and/or technology becomes available. MCC will notify the <br />Forest Service of any major change in aligrnment, quantity and/or configuration of the <br />exhausting equipment prior to installation. <br />MCC proposes to use 4X4 pickup trucks (Nvheeled or tracked), ATV's snowcats, <br />and snowmobiles for primary access to the sites during the appropriate seasons. Heavy <br />equipment including, but not limited to, bulldozers, backhoes, and boom trucks will be <br />utilized to move and maintain blower units. <br />ONGOING MONITORING ACTIVITIES <br />MCC proposes to access all exhausting blowers for monitoring and sampling on a <br />daily basis. At times, multiple trips per day will be necessary to maintain operation of <br />blower units. Access is required year round. <br />MCC proposes to use 4X4 pickup trucks (wheeled or tracked), ATV's snowcats, <br />and snowmobiles for primary access to the sites. Heavy equipment including, but not <br />limited to, bulldozers, backhoes, and maintainers will be utilized to maintain roadNvays to <br />the blower units. MCC may plow snow from the project roads as necessary to access the <br />MDNV's during winter months in accordance with Road Use Permit (RUP). Stipulations <br />on snow plowing as defined in the Decision Notice and RUP will be followed. <br />2008 SPECIAL ACTIVITIES <br />Due to the unpredictable nature of mining and the unknown conditions that are <br />frequently encountered as mining progresses it is likely that some event will occur that <br />9