Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/ DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 005 State : Colorado Permit/job #: M-2008-010 _ <br />Date : 0611612008 County: Montezuma Abbreviation :none <br />User : KAP Site :Mud Creek Pit Filename :M010-005 <br />Permit or other job action : New - <br />Task description :Mobilize/Demobilize <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/I : $88.67 $117.55 $125.45 <br /> <br />N[1N_PnAr)ARI F POHIPMPNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series lI - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $12545 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $284.44 I $214.12 $0.00