Laserfiche WebLink
West Elk Mrne <br />• North Fork Water <br />In 1976, MCC conditionally appropriated I S cfs for the Mount Gunnison Pipeline for industrial, <br />domestic, mining, and reclamation uses. In 1986, 0.88 cfs of this right was made absolute, and <br />in 1993, another 0.12 cfs was made absolute for a total of 1.0 cfs absolute. When this water right <br />is in priority, water can be pumped from the intake point to the freshwater storage pond(s) within <br />the surface facilities azea. In average years, this water right is typically out of priority from July <br />to September. <br />The 10-acre-foot capacity fresh water pond (FW-1) provides for water storage during the current <br />permit term. One more pond is anticipated for subsequent permit terms. Average withdrawals <br />are not expected to exceed 400,000 gpd during the term of permit. <br />C~ <br /> <br />1.05-2/9 Revised November 2004 PR/0; Rev. May 2006 PRIO <br />