Laserfiche WebLink
West ~ine <br />Table 45 <br />Mountain Coal Com an 's North Fork Water Ri hts <br /> Appropriation Adjudication Administration Case District <br />Name of Structure Date Date Number ~ Amounts Number Priority Notes Decreed' <br /> Number <br />Walter Galfob 06/01/1908 08/16/1936 31924.21336 0.75 absolute 3503 J-126 I <br />Chipmunk Ddch 06/10/1917 0528/1937 29260.24632 0.9 absolute 2563 H-109 Originally 1.0 cfs I <br /> 06/01/1937 0320/1954 31928.00000 0.57 absolute 5080 J-226 <br />Ton Bear Pi line 0320/1954 06/01/1937 31928.00000 0.43 absolute 5080 J-226 Transferred from Chi munk M,D <br />Mt. Gunnison Pipeline 11/17/1967 08/11/1969 43054.00000 15 conditional W2982 L-104 Alt. Point from Snowshoe PI. M,D,I,C <br /> 11/17/1967 12/31/1976 46020.43054 14.12condiGonal W2982 M,D,I,C <br /> 11/17/1967 12/31/1976 46020.43054 0.88 absolute 86CW147 <br />Snowshoe Reservoir 11/17/1967 08/11/1969 43054.00000 50,000 of conditional C5873 L-103 Transfened to Sediment and M <br /> 11/17/1967 08/11/1969 43054.00000 44.70 of transferred 80CW457 L-108 Freshwater Ponds M,C,I,D <br />Snowshoe Pi tine 11/17/1967 08/11/1969 43054.00000 70 conditional C5873 L-104 M <br />Mt. Gunnison #1 Mine Tunnel 09/09/1979 12/31/1980 47481.47368 0.49 absolute 80CW455 M,C,I,D <br /> 09/09/1979 12/31/1980 47481.47368 0.11 absolute 85CW277 M,D,I,D <br />Fresh Water Pond #1 11/17/1967 08/11/1969 43054.00000 9.98 of conditional 80CW458 L-103 Transferred from Snowshoe R. M,C,I,D <br /> 09/06/1979 12/31/1980 47481.47365 9.98 afabsolute 85CW279 L-104 Filled b Mt. Gunnison PI. M,C,I,D <br />Fresh Water Pond #2 11/17/1967 08/11/1980 43054.00000 9.98 of conditional 80CW458 L-103 Transferred from Snowshoe R. M,C,I,D <br /> 09/09/1979 12/31!1980 47481.47368 9.98 afconditional SOCW456 L-104 Filled b Mt. Gunnison PI. M,C I,D <br />Sedimentation Pond #1 11/17/1967 08/11/1969 43054.00000 13.66 of conditional 80CW458 L-103 Transferred from Snowshoe R. M,C,I,D <br /> 0724/1980 12131/1980 47687.00000 13.66 afoondiGonal 80CW457 M,C I,D <br />Sedimentation Pond tK2 11/17/1967 08/11/1969 43054.00000 10.05 of conditional 80CW458 L-103 Transferred from Snowshoe R. M,C,I,D <br /> 0723/1980 12/31/1980 47686.00000 10.05afconditional 80CW457 M,CI,D <br />Sedimentation Pond #3 11/17/1967 08/11/1969 43054.00000 1.03 afconditional 80CW458 L-103 Transferred from Snowshoe R. M,C,I,D <br /> 0724/1980 12/31/1980 47687.00000 1.03afconditional 80CW457 M,C,I,D <br />East Beckwith Reservoir #1 02/10/1930 0528/1937 30924.00000 568.8 of absolute 2563 H-71 MCC holds contract for 75% I <br /> 125 a <br />Jenkins#1 Ditch 06/01/1924 08/11/1969 41668.27180 0.25 absolute C5873 L-20 I <br /> 06/01/1964 08/11/1969 41790.00000 0.50 absolute W2541 L-67 I <br />Jenkins #2 Ditch 06/01/1924 08/11/1969 41668.27180 0.25 absolute C5873 L-21 I <br /> 06101/1964 08/11/1969 41790.00000 0.50 absolute W2542 L-68 I <br />Fire Mountain Canal 09/14/1996 0220/1904- 19415.17059- 220,155 shares Multiple 33-8 100 shares owned by MCC I <br /> 06101/1935 0320/1954 31924.31197 J-212 <br />1 As reported in the Cobrado Water Rights Tabulation, the five digits to the right of the decimal point are not all correct <br />2 MCC owns 100% of each decree except for Fire Mountain Canal and East Beckwith Reservoir. <br />3 C = Commercial, D = Domestic, I = Irrigation, M =Mining <br />1.05-214A Revised November 2004 PRIO; Rev. March 2006; Rev. May 2006 PRIO <br />