Laserfiche WebLink
PR-12 Exhibit 71 15 <br />collecting samples for laboratory analysis (Table 6). Site-specific baseline schedules will depend on site <br />accessibility and mine development timing. Baseline monitoring will be conducted monthly, generally from April <br />through September in order to provide adequate data to show seasonal variations in water quality and quantity. <br />Winter access to most areas at the WEM area is impractical, so the baseline monitoring will not be performed <br />from October through March. A summary of the baseline monitoring plan schedule frequencies is presented in <br />Table 5 and the baseline laboratory parameters are shown on Table 6. <br />Table 5 <br />Monitoring Frequencies <br />• <br />Routine Monitoring Baseline Monitoring <br /> <br />Month Flow / <br />Level Field <br />Parameters Laboratory <br />Analysis <br /> January <br /> February <br /> March <br /> April X X X <br />Rising Limb - April 3 to May 13 May X X X <br />Peak Flow - April 21 to June 26 <br />Low Flow -July 10 to October 8 <br />June <br />X <br />X <br />X <br /> July X X X <br /> August X X X <br /> September X X X <br /> October <br /> November <br /> December <br />"'Per discussion wltn J. t3umen ?ui_nvll7, Luwo) <br />September 2007 <br />HydroGeo, Inc. <br />•