West Elk Mine <br />• 8.4 to 11.2 feet, are projected in this area. Maximum changes in slope (tilt), ranging from 1.3 to <br />6.4 percent, are also projected for this area. The maximum horizontal tensile and compressive <br />strain is projected to range from 0.7 to 4.2 percent. Subsidence depressions and slope changes <br />will be less above the gate road pillars than above solid coal barriers, because they are projected <br />to yield during mining by as much as 4 feet (Table 2 of Exhibit 60B and 60E). <br />No subsidence depressions or changes in stream gradient were observed in Deep Creek, located <br />about 1,050 feet above mined longwall panel 17 during the annual traverse in July 2004. There <br />was no observable change in stream gradient or in stream flow. The depression and change in <br />gradient were apparently sufficiently gradual, so as to not be perceived by the author during the <br />traverse along the trail by the stream. <br />The stream area near the confluence of Dry Fork and Deer Creek, within the area of influence of the <br />west edge of longwall panels E2 and E3, will be monitored prior to, during, and after mining. This <br />is the area where the overburden thickness is at a minimum for the South of Divide mining area <br />(375 to 400 feet) and subsidence effects (subsidence, tilt, and strain) are expected to be at a <br />maximum. Survey monuments will be installed-roughly parallel to the long axes of longwall <br />panels E2 and E3-along Dry Fork, near the Dry Fork road, where measurements can be efficiently <br />made every two weeks when the longwall face is within the angle of draw. <br />In order to obtain detailed data on subsidence parameters in this stream valley environment, the <br />monuments will be placed on 40- to 50-foot centers-roughly equal to one-tenth of the <br />overburden thickness. The twice per month measurements will document subsidence amount, <br />• tilt, and horizontal strain, which will then be compared with predicted values in Table 2 of <br />Exhibit 60B and 60E. The monitoring will begin approximately 1 month prior to the angle of <br />draw of the advancing long,,vall face intercepting the stream chamlel. Surveying of each <br />monument will continue for at least t%vo months after the longwall has passed beneath the <br />monument. The monuments will then be surveyed on a quarterly basis when accessible. The <br />monitoring of the monuments will cease after two consecutive quarterly measurements show no <br />significant movement. <br />The flow in Dry Fork will be monitored twice per month upstream, downstream, and within this <br />area of maximum mining effects in panels E2 and E3, in order to document any flow changes <br />and also compare the results of field measurements with Mr. Dunrud's projections. These <br />measurements will be obtained using non-permanent, non-destructive devices such as flow <br />meters or portable flumes or weirs. One flow monitoring location will be established upstream <br />of the angle of draw of the panel being mined (E2 or E3), one or two within the area of the panel, <br />and another downstream of the panel outside the angle of draw. The twice per month flow <br />monitoring will begin one month before the longwall advances to a point where the stream <br />channel would be within the angle of draw of subsidence and continue for one month after the <br />panel has advanced beyond the area where the stream is within the angle of draw, assuming road <br />and climatic conditions allow such monitoring. After the month is complete, monitoring will <br />occur once every quarter for one year after mining of the longwall panel (E2 or E3) is complete. <br />The thalweg of the Dry Fork will be surveyed over panels E2 and E3 beginning at a point <br />downstrea u:®,f the angle of draw of panel E2 and continue upstream to a point above the angle of <br />• draw of panel E3. This survey will completed before subsidence mining commences in the SOD <br />and then remeasured upon completion of mining panel E2 and then again at the completion of <br />2.05-153 Revised June 2005 PRIO, Rev. Alarch 2006: May 2006 PRIO, Nov. 2006TR107,Apri12007TR108; Sep. 2007 PR12; Feb. 2008 PR-12