Laserfiche WebLink
West Elk Mine <br /> Use and Conservation of the Coal Resource ........................2.05-5 <br /> Operation Description ............................................................................ 2.05-7 <br /> Room and Pillar Mining Method ..........................................2.05-7 <br /> Longwall Mining Methods ..................................................... 2.05-9 <br /> Mining Under Restricted Areas ............................................ 2.05-9 <br /> Health and Safety .................................................................................... 2.05-9 <br /> General Mine Safety ............................................................... 2.05-9 <br /> Explosives and Blasting ..........................................................2.05-9 <br /> Fire Prevention ..................................................................... 2.05-10 <br /> Ventilation ............................................................................. 2.05-10 <br /> Electrical Power .................................................................... 2.05-11 <br /> Accidents ............................................................................... 2.05-11 <br /> 2.05.3 Operation Plan - Permit Area ............................................................. 2.05-15 <br /> (1) Production Methods and Equipment ............................................ 2.05-15 <br /> (2) Operation Description ..................................................................... 2.05-15 <br /> F-Seam ................................................................................... 2.05-15 <br /> E-Seam ................................................................................... 2.05-15 <br /> B-Seam ................................................................................... 2.05-15 <br /> Manpower Requirements .................................................... 2.05-15 <br /> (3) Mine Facilities .................................................................................. 2.05-15 <br /> General Construction Procedures ...................................... 2.05-16 <br /> Major Building and Structures ........................................... 2.05-17 <br />• . <br />Haul/Access Roads 2.05-24 <br /> ............................................................... <br />Light-Use Roads . . 2.05-25 <br /> Department of Highway Approvals .................................... 2.05-26 <br />Landslide Corrective Measures .......................................... 2.05-27 <br />(4) Ponds, Impoundments, and Diversions ......................................... 2.05-28 <br />Hydrologic Design of Runoff Ponds .................................... 2.05-29 <br />Miscellaneous Sediment Control Facilities ........................ 2.05-30 <br />General Requirements for Sedimentation <br />Control Facilities .................................................................. 2.05-31 <br />Sedimentation Pond Operation ...........................................2.05-31 <br />Spillway Designs ................................................................... 2.05-33 <br />Stability Program Description ............................................ 2.05-34 <br />Hydrologic Protection During Construction ..................... 2.05-34 <br />Hydrologic Protection During Operation .......................... 2.05-37 <br />Impacts of Overtopping Hydrologic Structures ................2.05-37 <br />Collection and Diversion Channels ..................................... 2.05-38 <br />Small Area Exemptions ........................................................2.05-39 <br />Fresh Water Ponds .................................................... .:......... 2.05-39 <br />(5) Topsoil ......................................................................................2.05-39 <br />(6) Overburden ..............................................................................2.€ 5-40 <br />(7) Coal Handling Structures .......................................................2.05-40 <br />(8) Coal Processing Waste and Non-Coal Processing Waste .... 2.05-42 <br />(9) Return of Coal Mine Waste to Abandoned Workings......... 2.05-44 <br />viRev. March 2006; Rev. April 2006 PRIO; Rev. May 2006 PRI0 Sep 200% PR12Feh. 2008 PR12