Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />• 4.28 FACILITIES NOT LOCATED AT THE MINESITE <br />This section is not applicable to the permit revision. All facilities used by Colowyo in their current <br />operations will continue to be used for the South Taylor mining operations. <br />4.29 IN STTU PROCESSING <br />This section is not applicable. <br />4.30 CESSATION OF OPERATIONS <br />4.30.1 Temporary <br />If, for any unforeseeable circumstances, temporary cessation of mining and reclamation operations at the <br />Colowyo operation becomes necessary for a period of thirty (30) days or more, Colowyo will submit to <br />the Division a notice of intention to temporarily cease or abandon mining and reclamation activities. This <br />notice will include a statement of the exact number of acres which will have been affected in the permit <br />area prior to temporary cessation, the accomplished, an identification of back filling regazding, <br />revegetation, environmental monitoring, and water treatment activities that will continue during <br />temporary cessation. <br />4.30.2 Permanent <br />At the permanent conclusion of surface mining operations, Colowyo will close, backfill, or otherwise <br />permanently reclaim all affected azeas. The reclamation plans aze set forth in Section 2.05.5. The <br />• projected post-mining topography is set forth on the Post-mining Topography maps (maps 19A and 19B). <br />Colowyo will remove any equipment, structures, or other facilities at the conclusion of mining activities <br />and will reclaim the affected land. <br />END OF PERMIT REVISION APPLICATION PR-02 <br /> <br />South Taylor/Lower Wilson-Rule 4, Page 32 Revision Date: 3/30/07 <br />Revision No.: PR-02 <br />