My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-29_PERMIT FILE - C1981019A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2008-05-29_PERMIT FILE - C1981019A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:12 PM
Creation date
6/19/2008 1:28:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/29/2008
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.02.6 Blasting Signs <br />Colowyo conspicuously displays signs reading "Blasting Area" along the edge of any blasting area~that <br />comes within 50 feet of any road within the permit azea or within 100 feet of any public road right-of- <br />way. The blast warning and all-clear signals that Colowyo uses are clearly explained at the main entrance <br />to the permit area from Highway 13/789. A sign stating "Blasting Area, Be Careful" is also placed at the <br />entrance to the permit area from Highway 13/789. <br />4.02.7 Topsoil Markers <br />Colowyo cleazly marks all stockpile topsoil with signs reading "Topsoil." <br />4.03 ROADWAYS <br />The following sections deal with roads defined per Rule 1.04 (111). <br />4.03.1 Haul Roads <br />The construction, location, and maintenance of haul road "A" (4 mile roadway from pit area to Gossard <br />Loadout) and haul road "B" (1.4 mile roadway from Highway 13 to haul road "A") is discussed in the <br />existing permit document. These roads will continue to be used as part of the South Taylor/L,ower <br />Wilson mining area. Refer to the existing permit document for details regazding these haul roads. Access <br />to the South Taylor mining area will be through the existing mining area and therefore additional haul <br />roads will not be required to be constructed. <br />• Roads that will be constructed in the actual mining azeas will constantly change as the operation <br />progresses. The "in-pit" roads will be maintained by a motor grader and regulazly wetted to minimize <br />dust as required by the air quality permit. Any drainage off the "in-pit" roads will be retained in the pit or <br />diverted to the drainage and sediment control structures located on Map 33B and in Exhibit 7, Hydrology. <br />Colowyo will maintain the haul roads throughout the life of the mine with repairs including blading, <br />filling of potholes, and replacement of road surface as necessary. Likewise, watering for dust control will <br />be implemented as necessary. Other information relevant to haul roads is provided in the existing permit. <br />4.03.2 Access Roads <br />Other than the Sturgeon Access Road, there will be no changes to existing access roads for the South <br />Taylor pit expansion. <br />The existing two-track Sturgeon Road will be upgraded to allow access for construction and for routine <br />monitoring and maintenance. Map 25B provides the road design information for Sturgeon Access Road. <br />The Sturgeon Access road cut/fill stabilization seed mix is as follows: <br /> <br />Western wheatgrass @ <br />Mountain Brome @ <br />Kentucky Bluegrass @ <br />Sanfoin @ <br />Total <br />4 Lbs PLS/Acre <br />4 Lbs PLS/Acre <br />2 Lbs PLS/Acre <br />2 Lbs PLS/Acre <br />12 Lbs PLS/Acre <br />South TaylodLower Wilson- Rule 4, Page 2 Revision Date: 3/30/07 <br />Revision No.: PR-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.