Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />• 2. A-6 Well - Located in the Good Spring Creek alluvium, this site represents the condition up-gradient of <br />proposed and current mining activities. <br />3. North Good Spring Well - Located in the Good Spring Creek alluvium, this site represents the down-dip <br />condition below existing and proposed mining activities. <br />4. MT-95-02 - Located in the Taylor Creek alluvium, this site represents the down-dip condition below current <br />and proposed mining activities. <br />5. A-7 - Located in the West Fork of Good Spring Creek alluvium, this site represents a potential down-dip <br />condition below South Taylor mining activities. <br />6. A-8 - Located in the West Fork of Good Spring Creek alluvium, this site represents the condition up-gradient <br />of South Taylor mining activities. <br />uarterl Alluvial Ground Water Field Parameters <br />Temperature Water Level pH Electrical Conductivity <br />Ouarterlv Alluvial Ground Water Laboratorv Parameters. <br />pH Conductivity at <br />0 Total Dissolved Bicarbonate Calcium (Ca +2) <br /> 25 <br />C Solids (HC03 <br />Magnesium (Mg+2) Ammonia (NH3) Nitrate Phosphate (P04 Sodium (Na) <br /> as P) <br />Sulfate (S04) Arsenic (As) Iron (Fe) Lead (Pb) Manganese (Mn) <br />Mercury (Hg) Selenium (Se) Zinc (Zn) Water Level <br />Prior to mining at Lower Wilson, the following three groundwater monitoring sites will be added to the <br />sampling schedule: <br />• 1. MW-95-01 - Located in the Wilson Creek alluvium, this site represents the upstream, <br />undisturbed background conditions of the alluvial aquifer. <br />2. MW-05-03 - Located in the Wilson Creek and unnamed drainage alluvium, this site <br />represents alluvial groundwater quality immediately downgradient from Lower Wilson. <br />3. MW-95-02 - Located in the Wilson Creek alluvium, this site represents the downgradient <br />conditions below Lower Wilson and the proposed haul road. <br />It is reasonable to expect potential future monitoring activities for the Lower Wilson locations to mirror <br />those for the existing operation as it pertains to frequency and specific parameters. <br />Groundwater. Fill Piezometers - The Streeter Draw piezometer and the Section 16 Fill piezometer will be <br />monitored annually for water levels. The West Pit Fill piezometer will be monitored quarterly for water <br />levels. After mining, two additional piezometers will be installed into the toes of East Taylor Fill and <br />West Taylor Fill as described in Exhibit 21 Item 1. These piezometers will be added to the monitoring <br />program. <br />4.05.14 - 4.05.18 Various Topics <br />These sections are addressed in the original permit and will not change with addition of the South <br />Taylor/Lower Wilson permit revision. <br />4.06 TOPSOIL <br />The topsoil removal, storage, and redistribution plan for the proposed disturbed area associated with the <br />. Lower Wilson and South Taylor mining areas will follow the procedures described in Section 4.06 of the <br />South Taylor/Lower Wilson - Rule 4, Page 19 Revision Date: 3/04/08 <br />Revision No.: TR-70