Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />__ ~_- .~:.~~ ~_~_ ~ __. „~_-._x~~-r~ <br />,~ ~ `~~__:: M <br />4.OS.S Acid-forming and Toxic-Forming Spoil <br />Acid forming materials do not exist within the overburden to be removed by the mining operations. A <br />discussion on the overburden at the Colowyo operation has been conducted as set forth in Section 2.04.6. <br />A discussion of the overburden monitoring plan is set forth in Section 2.05. Acid-Base Accounting <br />shows that almost none of the encountered interburden has a net acid-generating potential, and the <br />average acid-neutralizing potential to acid-generating potential ratio ranges from about 50 to about 90 in <br />each borehole in the proposed pit, indicating that there is 50 to 90 times more acid-neutralizing potential <br />than there is acid-generating potential in the interburden (Exhibit 6, Item 6). <br />4.05.9 Post-Mining Impouudmeuts <br />Colowyo constructs small impoundments on reclaimed areas in accordance with Section 4.05.9 of the <br />CMLRD regulations for Coal Mining, 3/21/01. These small impoundments are essential and basic to the <br />management of the rangeland post-mining land use of livestock grazing and wildlife habitat. The design <br />of post-mining impoundments provides for structures having a vertical height less than five feet from the <br />bottom of the channel to the bottom of the spillway and impound less than two acre-feet of water. As <br />such they aze exempt from Division of Water Resources, Office of State Engineer requirements. Water <br />harvesting ditches may also be used to enhance the function of the impoundments, which is consistent <br />with practices employed on adjacent rangelands. <br />The impoundments collect surface runoff from precipitation events and snowmelt from reclaimed azeas. <br />The impoundments do not result in the diminution of the quality or quantity of water for downstream <br />water users. Colowyo is the holder of water rights immediately downstream. During periods of low <br />. precipitation, the impoundments may be dry, which is consistent with regional practices on similaz <br />rangelands. Since the source of water is surface runoff from revegetated azeas the quality of the water <br />will meet the requirements of the intended use. <br />The post-mining impoundments have slopes of 4h:ly or less to provide easy access to both livestock and <br />wildlife. These impoundments and any associated ditches, while intended to be permanent, will be <br />classified as temporary until the requirements of Rule 4.05.9 aze met. Prior to construction, all designs <br />aze submitted to the Division. A copy of the as-built design information will be submitted after <br />construction for inclusion into Exhibit 7, Item 20. In addition, sedimentation ponds that are subsequently <br />approved as part of the post-mining land use, as shown on the hydrology -South Map (Map 12), will <br />remain as permanent impoundments after the requirements of Rule 4.05.9 have been met. <br />All embankments, impoundments, and associated structures will be revegetated if construction materials <br />aze conducive to plant growth. If not, rock or gravel will be used on the embankments. The quarterly <br />routine inspections of these structures will be conducted as required by Rule 4.05.9(17). <br />The Division granted Colowyo a waiver to the requirements of 4.05.9(17) for small impoundments. The <br />waiver applies only to impoundments which are not the primary sediment control structure for a particulaz <br />area; are constructed in reclaimed azeas of the mine to enhance the approved postmining land use; are <br />completely incised, or have a storage capacity no greater than two-acre feet and an embankment no <br />greater than five feet in height. The small impoundments will be inspected on a yearly schedule until <br />removal of the structure or release of the performance bond as directed in rule 4.05.9(14). The <br />inspections will be performed by a qualified registered professional engineer, or other qualified <br />professional specialist under the direction of a professional engineer, or a qualified person other than, and <br />not under the direction of, a professional engineer. <br />South Taylod[.ower Wilson-Rule 4, Pale IS Revision Date: 3/30/07 <br />Revision No.: PR-02 <br />