My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-08_PERMIT FILE - C1981018A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2008-05-08_PERMIT FILE - C1981018A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:14 PM
Creation date
6/19/2008 1:26:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
5/8/2008
Section_Exhibit Name
Section V. Mine Surface Facilities Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• slope erosion, allow the reclaimed banks to blend into the existing natural terrain and allow animals <br />to graze on the sides after final reclamation. <br />Estimates of sediment from the first four refuse areas are included in Illustration 8. The results are <br />listed below. These estimates are based on the entire refuse pile being covered with bare topsoil. <br />The estimates were made using the (USLE) Universal Soil Loss Equation (see Section V.B.4), <br />Since seeding will commence soon after the topsoil is placed, these estimates are conservatively <br />higher than actually anticipated. As vegetation is established, the sediment yield per year will be <br />drastically reduced. When vegetation has been established equal to the premining growth in the <br />area, the sediment yield will be on the order of 25 times less than for bare soil as calculated. <br />Sub-area Too of Pile Face of Pile <br />1 7.1 TPY 529.2 TPY <br />2-3 6.8 TPY 1,872.4 TPY <br />4 10.5 TPY 1,368.4 TPY <br />The layout of the waste banks and a typical cross section are presented in Maps 76, 77, 77A, 63 <br />and 150. The last lift will not be compacted and its top 8-12" will be scarified to enhance a <br />permeable interface for roots and water. <br />V.B.6 Post Reclamation Sediment Control Sediment Pond DP-1 which collects runoff from the <br />• D Portal Area, will be removed during the removal of the Scullion Gulch diversion system when the <br />D Portal Area is reclaimed. A series of three loose rock check dams have been constructed in the <br />Scullion Gulch stream bed and its tributaries in the D Portal Area. The loose rock check dams ahd <br />other sediment control measures are discussed in Section IV.J. The loose rock check dams are <br />shown on Maps 43, 44 and 46. Cross-sections and details are shown on Map 43. The three loose <br />rock check dams will be removed following successful reclamation and revegetation of the D-Portal <br />area upstream. <br />The loose rock check dams will retard streamflow and thereby minimize erosion in the reclaim@d <br />Scullion Gulch stream bed. In addition, sediment deposition will occur behind the dams during <br />runoff from small storms. It is anticipated that seepage through the rock dams will be partially <br />blinded off by sediment deposition and thereby provide a minimal amount of settling volume for <br />runoff from small storms. <br />The total storage volume behind the three check dams is 1.74 acre-feet. The 3 year average <br />sediment yield (per USLE) for the reclaimed D Portal Area is 0.51 acre-feet. The three year <br />sediment yield for the total drainage area above and including the D Portal Area is 6.02 acre-feet, <br />Thus, the reclaimed D Portal Area with the proposed contour furrowing and mulching would <br />increase the sediment load in the Scullion Gulch at the D Portal Area by only 9.3% without the <br />check dams being installed. See Illustration 22 for calculations. <br />• <br />Mid-Term Review 2002 (8/2002) V-14
The URL can be used to link to this page
Your browser does not support the video tag.