Laserfiche WebLink
• SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) <br />illustrating the location of topsoil stockpiles constructed during the previous year and the approximate <br />locations for stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2007, Trapper constructed six new stockpiles labeled D07-1, F107, F207, F307, Z107, and <br />Z207. Additionally seven existing piles; A94-4, A97-1, A98-1, F97-1, F106, Z06-1 and LG-1 were <br />totally depleted for topsoil replacement or relocation. Topsoil pile ZTS-1 was partially removed during <br />stripping activities in Flintlock Pit. <br />At the end of 2007, excluding stockpiles abandoned with the approval of MR-155 and TR-94, there are <br />74 existing topsoil stockpiles at Trapper affecting 184.2 acres and storing approximately 3,855,213 <br />cubic yards of salvaged topsoil. <br />The proposed approximate locations for topsoil stockpiles in 2008 may exceed the actual number that <br />will be constructed. Proposed topsoil stockpiles and the number of piles constructed are dependent <br />upon the field conditions that are encountered each reclamation season. Additionally, particular piles <br />may be depleted from or added to in order to maintain a cost effective salvage or replacement program <br />during a particular year. <br />• GCR 3/08 <br />[DRMS\07TSte d5-0] . <br />0