Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2007 <br />Trapper Mine C-81-010 Trapper Mining Il le_?i <br />Mine name Permit # Permittee <br />Address: PO Box 187 Craig, CO 81626 •.atw^ <br />istt? a? ?eb1 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agree??i <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be dearly and accurately <br />identified on a map included with the report. <br />Land Status categi <br />Acres disturbed <br />Acres backfilled and <br />Acres topsoiled <br />Last Years <br />Cumulative Total i nr. <br />3,472.6 + 35.1 <br />1,263.9 + 52.6 <br />1.263.9 + 52.6 <br />ear w Cumulative Total <br />Year-- <br />3,507.7 <br />1,316.5 <br />= 1 1.316.5 <br />Seeding typically begins the minimum 10-year reclamation liability perriod Please report the acres for III each sate o below. Do not include acres that have achieved final, Greater <br />• Last Years This than 10 <br />Cumulative Calendar Cumulative 10 years <br />Total year Total 1 or less years i <br />Acres seeded* 1,263.9 + 52.6 = 1,316.5 = 1,023.8 + 292.7 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 6.122.3 and the total number of acres: <br />Phase I released 3 334.0 Phase 11 released 3.289.5 Phase III released 2.614.6 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed n/a <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 1.091.6 <br />Acreage in active mining areas 3 1,099.6 <br />i(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector <br />ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, <br />repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfiand graded areas <br />• of refuse piles, coalmine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; and noncoal <br />waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded