Laserfiche WebLink
Prniprrt• Rrat3-7¢ Racin Cann! & f-,raval Pit _ KAnffaf f'.niuntu f`.ntnrarin <br />Date: May 2008 <br />Table for Summnanr of Debits for Excavated Materials <br />!dotes: 1. Assume extraction of 20,000 tons per operational month (i.e., 100,000 tons per year). <br />2. Assume 4% of extracted materiat weight below the water surface is consumed water <br />3. Assume that 75% of the extracted material is below the groundwater surface. <br />4. Assume Site Operational June - October for a 10 Year Period <br />Year Period <br />7 June <br />7 July <br />7 August <br />7 September <br />7 October <br />7 November <br />7 December <br />7 January <br />7 February <br />7 March <br />7 April <br />7 May <br />8 June <br />8 July <br />8 August <br />8 September <br />8 October <br />8 November <br />8 December <br />8 January <br />8 February <br />8 March <br />8 April <br />8 May <br />x.7.4414 <br />0.4414 <br />0.44 14 <br />0.44'14 <br />0,4414 <br />2. <br /> Annual <br />Consumption Estimated <br />Associated with Total <br />Excavated Consumptive <br />Materials Use <br />(acre-feet 3 (acre-feed <br />0.4414 <br />0.4414 <br />0.4414 <br />0.4414 <br />0.4414 <br />2.207,