Laserfiche WebLink
I <br />NOV CV-2008-001 Abatement Step 2 <br />Page 3 <br />d) The application will include a schedule for implementation of the slide remediation plan, including the short term and long term sediment <br />control measures for the Pond 12 watershed <br />Response: A proposed schedule for implementing the slide remediation will be submitted with the technical revision. <br />With regard to the short and long term sediment control for the Pond 012 watershed, it has been addressed in TR-37 <br />that is under review. <br />If there are questions or comments regarding this letter, please contact me at (970) 276-5217 or (970) 846-3648. <br />Sincerely, <br />Roy Karc, <br />Reclamation Manager <br />Seneca Coal Company <br />cc: Brian Dunfee (PIC) <br />Scott Belden (PIC)