Laserfiche WebLink
ri'd Frdnk A. r.dylor, ter., M.D. <br /> (7'7 <br /> le a2 Executive DifeCior <br /> W?2l0 East llth Avenue <br /> Denver, Colord!o 80220 <br /> Phcne(303) 320-8333 <br /> November 28, 1980 <br /> CERTIFIED:P26 8285727 <br /> Mid-Continent Resources, Inc. <br /> Douglas Bowman <br /> Box 158 <br /> Carbondale, CO 81623 <br /> RE: Final Permit, NPDES Permit Number: CO-0000396, Pitkin County <br /> Gentlemen: <br /> Enclosed please find a copy of the permit issued under the Federal Clean <br /> Water Act and Colorado Water Quality Control Act. <br /> Issuance of this permit constitutes a final determination by the Division <br /> of Administration of the Colorado Department. of Health , in conjunction with <br /> the U.S. Environmental Protection Agency and may be subject to administrative <br /> • review proceedings pursuant_ to the State Administrative Prccedure ^,c., in- <br /> cluding an adjudicatory hearing. You are advised to consult this. act and <br /> particularly to consult_ Sections 24-4-104, 24-4-105, 24-4-102(7) , and 25-8-401 , <br /> C.R.S. 1973 for more information. In addition , the Regulations for the State <br /> Discharae Permit System contains material that is pertinent to any admini - <br /> strative review of the issuance of this permit. <br /> Your NPDES Waste Discharge Permit required that specific action be performed <br /> at designated times. Failure to meet these requirements constitutes a vio- <br /> lation of this permit and can result in civil and/or criminal action(s) . <br /> Please read the permit very thoroughly. <br /> 1 . All municipal and industrial facilities are required to submit self- <br /> monitorina information. (PART I .B. Monitoring and Reporting) . <br /> Frequencies and types of self-monitoring are summarized in PART I .A. <br /> Effluent Limitations and Monitoring Requirements . <br /> 2. Monitoring and reporting requirements for feedlots are described in <br /> PART I .A. Effluent Limitations and Monitoring Requirements (see 2.c. ) <br /> and in PART I . B. Monitorinq and Reporting. <br /> 3. In some instances a schedule of compliance is to be submitted if required <br /> by your permit. Please note the required date as specified in PART I of <br /> the permit. <br /> • <br /> 2 <br /> i' <br />