Laserfiche WebLink
• It was also assumed that since the drainage basins are small, no sediment would be deposited until <br />it reaches the sediment control ponds. <br />The three-year sediment yield is calculated as follows: <br />Sediment Volume = (AxArlTons/vr x 2,000 Iblron x 3 yr <br />(Acre-feet) 80 Iblcu ft x 43560 sq ft/acre <br />Sediment volume calculations for sediment ponds are included in Illustrations 4, 5, 6, 6A and 7. <br />The sediment volume requirements are also shown on the pond drawings, Maps 34, 78, 79, 80 and <br />80A. <br />Peak runoff flow rates were initially estimated using procedures set forth in SCS-TP-149 (Rev. <br />1973) "A Method of Estimating Volume and Rate of Runoff from Small Watersheds." In all cases, <br />runoff curve numbers (RCN) were selected assuming antecedent moisture condition two (AMC II) <br />prevailed. Disturbed areas were assumed to be the same as "farmstead" areas in Table 2 <br />(NRCS-TP-149). Undisturbed areas were assumed to be the equivalent of "fair range without <br />mechanical treatment", in Table 2 (NRCS-TP-149). Hydrologic soil groups were taken from the <br />NRCS soil survey data previously discussed. <br />• Total runoff volumes for 10-year, 24-hour storms were determined from Figure 3 of NRCS-TP-149 <br />which is a solution of the runoff equation: <br />Q = P-0.2xS z <br />(P+0.8xS) <br />where: <br />Q =accumulated direct runoff <br />P =accumulated rainfall (from design storm) <br />S =potential maximum retention <br />= 1000 - 10 <br />RCN <br />RCN =runoff curve number <br />Runoff calculations for ponds designed before mine construction are included in Illustrations 4, 5, 6, <br />and 7. <br />The available pond capacities were determined by the average end area method from planimetered <br />areas of contours shown on the drawings. All ponds were sized according to the requirements of <br />Section 4.05.6. <br />The peak runoff rates to the ponds for the 25-year, 24-hour and 100-year, 24-hour storms were <br />• initially determined for preliminary design purposes from the graphics! procedures for determining <br />Mid-Term Review 2002 (8/2002) V-10 <br />