Laserfiche WebLink
_e <br />CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />BOREHOLE DESCRIPTION SEALING ITEM /METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Bottom Plug PVC plug - 10 in. 9.875" 250' 1.00 EA $176.11 $178,11 <br />-Fill Ho% with Cement Portland cement grout 9.875" ~ 250' 67.00 bag $8.80 $589.60 <br />-Cut Casing at Surface Exp. casing removal, 8-16 in. NA NA 1.00 LF $8.18 $8.18 <br />-Boreho% Marker Borehole marker NA NA 1.00 EA $2.17 $2,17 <br />-Drill Rig Time TLAS COPCO ROC D7-11, 4 . NA NA 4.00 HR $162.70 $650.79 <br />-Water Truck Time Water Tanker, 2, 500 Gal. NA NA 4.00 HR $56.94 $227, 75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~~~ ~~~ <br />Total Cost : $1,655 <br />L _ ;> <br />