My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work conYd Task # : 2oB sheet 2 of 2 <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill truck : 2 passes <br />Excavators and front shovels -machine cyGe time vs. job cend@ion rating : NA <br />-selected value within basic rating : NA <br />Track loaders - matedal descr.: NA <br />- cycle time elements (min.) : Load <br />NA Maneuver: NA Dump: 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumf 0.575 minutes <br />c~Nu r.,.o cerr...< '1 nnninm r nAlrinn rb«rfnnnn c~r•.m. rmin ~ s,,, mr•n <br />Matedal ~~.Bank or broken material 0.040 (Cat HBJ <br />Stockpile :Conveyor or dozer piled f0 R. high or less 0.010 (Cat HB) <br />Truck ownership :Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation :,Constant operation -0.040 , (Cat HB) <br />Dump target :'Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.030 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.5/5 minutes <br /> Net load time per truck' : 1.090 minutes <br />Truck Cvcle Tlme : • oink a tat loader ryas wmpleted during InxJt excherge d e4. loader mac r me ~ axcharpe ume <br />Truck exchange time ": 0.00 minutes........ Adjusted for site altitude : 0.000 minutes <br />Truck toad time: 1.090 minutes........ Adjusted for site altitude : f. 185 minutes <br />Tmck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.800 minutes <br />•• q8t e10 ,l exchange lima <adj. loader ryda lime (truck exchange completetl during tat loader tyde) <br />Truck travel (haul & return) time: Road condition :Hard, smooth, stabilized, suAaced, watered, maintained <br />Haul route <br />Road <br />aegmeM a Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%q) Speed <br />(Ieet/minute) Travel time' <br />(minutes) <br />1 750 0.00 2.00 ~ 2.00 2868 0.359 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ": 0.359 i <br />1 750 0.00 2.00 2.00 2905 0.287 <br /> <br /> <br /> <br /> <br /> i ~ <br /> ~ i ~ ~ L <br /> <br />• trgvef lime gfwWfl b each reamem inaudn accebral,oNdeuleration aarya(merx Return time' <br />"~olal haw arA return lime shown inaWSe alt2ude adlualm«n Total truck Cycle time <br />Loading tool unit production <br />TNCk unit production <br />Optimal no. trucks loading tool <br />JOB TIME AND COST <br />478.5_7 LCY/hour...... Adjusted for job efficiency <br />215.55 LCY/hour...... Adjusted for job efficiency <br />2 trucks........... Selected no. trucks/loader <br />Adjusted hourly truck team production <br />Adjusted houdy single tmck/loader team production <br />Adjusted houdy multiple truck loader team production <br />Fleet size : 1 Team(s) <br />Unit cost : (1.195 ILCY <br />/"' ~i ~ Z <br />r C~ <br />ninutes <br />0.287 minutes <br />2.830 minutes <br />397.21 _ LCV/hour <br />_ 178.91_ LCV/hour <br />2 trucks <br />357.82 LCY/hr <br />357.82 LCY/hr <br />357,82 LCY/hr <br /> <br />Total job time : T. 10 Hours <br />Total job cost : 5898 <br />ZZiJ~G~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.