My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~~ <br />CIRCES Cost Estimating Software <br />I • <br />u <br /> <br />PROJECT IDENTIFICATION <br />Date : 12~IuF2007 Permit or job no.: C1982056 Site : Foidel Creek Mine <br />User : JHB Abbreviation : none State :Colorado <br /> Filename : C056-000 County : Routt <br />Agency ar organization name :Colorado Divison Of Reclamation Mining And Safety <br />Permit or job action : REmove double wide office trailer <br />TASK LIS r IUIREGT COSTS) FORM FLEET TASK DIRECT <br />NO. ~ TASK DESCRIPTION USED SIZE HOURS COST <br />18a -Remove/dispose of doublewide office trailer demolish 1 1. $1.456 <br /> SUBTOTALS: 1.50 $1,456 <br />•indudes inHadon factor atljustment or: NA % TOTAL DIRECT COST'- $1,456 <br /> <br />INDIRECT COSTS ,, _.,.: <br />ovERNEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $29 <br />Performance bond : 1.05 % of direct total = $15 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $146 <br />not required (or eqp. operator serves as super) TOTAL O 8 P = $190 <br />LEGAL-ENGINEERING•PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $1,646 <br />Financial warranty processing (legal/related costs} : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $82 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted Por et task level TOTAL INDIRECT COST = $273 <br /> TOTAL BOND AMOUNT (direct + Indirect) = Sf,729 <br />~ i~ 2 / y /{ - l.~ J- <br />
The URL can be used to link to this page
Your browser does not support the video tag.