Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Division Of Reclamation, Mining And Satety <br />Task # : 16C State :Colorado PermiUob # : C1982O5ti <br />Date : 06/07/2007 County :Routt Abbreviation :none <br />User : JHB Site : Foidel Creek Mine Filename : C056-16c <br />Permit or other job action : Mr216 <br />task description :Mob/demob crane <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic /olding gooseneck, drop deck equipment hailer (257, 507, and 1007) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operatorcost/hour: $27.66 $27.68 $2768 <br /> Helper cosUhour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $11755 $125.45 <br />NnN-Rnenewt e <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />CosUhr/unk Haul Rig <br />CosUhr/unR Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Retum Trip <br />CosUhrMeet DOT permit <br />Cost/Neet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : 50.00 $0.00 50.00 <br /> <br />