Laserfiche WebLink
• <br />• <br /> <br /> <br />THICKENER UNDERFLOW LINES PROJECT (TR07-60) <br />RECLAMATION COST ESTIMATE <br />Facilities Demolition and Removal <br />Pipeline Reclamation <br />Remove pre-cast 48-inch diametermanholes - (3 @ $1,000 ea) 3,000 <br />Cut-off and cap pipelines below grade - (2 @ $200 ea) 400 <br />Subtotal $3,400 <br />Borehole Reclamation <br />Plugging and sealing materials - (310' x 8" dia., 6cy cement @ $70/cy) 280 <br />Plugging and sealing labor - (2 hrs @ $250/hr) 500 <br />Subtotal $780 <br />Site Reclamation <br />Backfilling, compaction, and grading - (0.6 acres @ $1,200/ac) 720 <br />Stream restoration - (301ineal ft @ $100/ft) 3,000 <br />Topsoil replacement - (0.6 acres @ $1,000/ac) 600 <br />Revegetation - (0.6 acres @ $800/acre) 480 <br />Subtotal $4,800 <br />Subtotal -All Direct Costs $8,980 <br />Indirect and Administrative Costs ((a7 8%) 720 <br />Total Estimated Reclamation Cost $9,700 <br />Notes: Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />TR07-60 <br />A-130 <br />05/01/07 <br />